Department package
Sterilisation (CSSD) and laboratory package
Steam sterilisation, drying and stainless steel workspace for a hospital CSSD, plus the core bench equipment for a clinical laboratory.

Sterilisation capacity decides how many operations a hospital can run in a day. This package pairs horizontal and vertical steam sterilisers with the stainless steel workspace a CSSD needs to clean, pack and store instruments, plus bench equipment for the laboratory next door.
Equipment list
Quantities are for one room; change them in your request.
| Image | Model | Role in the room | Qty |
|---|---|---|---|
![]() | KL-ST005 Horizontal Steam Sterilizer | Horizontal steam sterilizer, high capacity | 1 |
![]() | KL-ST002 Vertical Pressure Steam Sterilizer | Vertical pressure steam sterilizer | 1 |
![]() | KL-DT001 Electrothermal Constant-Temperature Drying Oven | Electrothermal constant-temperature drying oven | 1 |
![]() | KL-TC060 Stainless Steel Washing Sink | Stainless steel washing sink | 1 |
![]() | KL-TC059 Work Table | Three-tier stainless steel work tables | 2 |
![]() | KL-TC056 Shelf with Four Layers | Four-tier stainless storage shelves | 4 |
![]() | KL-TC076 Stainless Steel Sterilization Tray | Stainless steel sterilization trays | 10 |
![]() | KL-CE001 Bench Centrifuge | Bench centrifuge | 1 |
![]() | KL-LC001 Blood Storage Refrigerator | Blood storage refrigerator | 1 |
Planning notes
What to settle before the order goes into production.
Size sterilisers from the theatre schedule
Estimate instrument sets per day from the number of operations, then size chamber volume and cycles. A horizontal steriliser handles bulk loads; a vertical unit is a useful backup and handles smaller departments.
Separate dirty, clean and sterile zones
A one-way flow from washing sink to packing table to steriliser to storage shelf prevents recontamination.
How a package order runs
- Step 1Send your list. Room schedule, tender bill of quantities or a list of models and quantities.
- Step 2Model matching. We match each line to a Keling model and send datasheets and a quotation.
- Step 3Specification sign-off. Voltage, plug and gas standards, colours, labels and OEM details confirmed on the proforma invoice.
- Step 4Production and checks. Built and tested in Yangzhou. You can book third-party pre-shipment inspection.
- Step 5Packing and shipping. Export packing, packing list with dimensions, and shipping documents for customs.
Questions
What is the difference between a vertical and a horizontal steam sterilizer?
Vertical sterilizers load from the top, take less floor space and suit clinics and labs. Horizontal sterilizers load from the front, hold more and suit hospital CSSDs.
Request for quotation
Quote this department package
Send the number of rooms and any changes to the list. We will return one quotation for the whole package.
- Reply within 1 working day
- FOB Shanghai or CIF your port
- OEM and tender documents








